Skip to content
  • Stuff
  • Travel
  • Beverages
  • Support Antipaucity
  • Projects
  • About

antipaucity

fighting the lack of good ideas

assessment and capacity analysis and planning for virtualization initiatives

Posted on 25 August 201125 August 2011 By antipaucity No Comments on assessment and capacity analysis and planning for virtualization initiatives

Q:

What would need to go into an assessment tool for a virtualization initiative?

A:

Typical factors may include:

  • current CPU load per server
  • what’s running on each server
  • current hardware of each server
  • expected percentage increase in usage
  • OS usage – homogenous or heterogeneous
  • new hardware or re-use current hardware
  • storage needs
  • vendor for virtualization (VMware, Microsoft, Xen)

And don’t forget the all-important:

  • BUDGET

My experience is all related around VMware, but what I’ve seen and used in the past is the following:

  • look at all CPU utilizations currently
  • add those average and peak percentages in two separate columns
  • plan for ~10% overhead from your hypervisor of choice
  • for every 40% of ‘average’ or 80% of ‘peak’, use one server of the type you now consider “high-end” (ie, if you have a total of 687% of ‘peak’, you need 9 physical servers running your hypervisor of choice)

Other thoughts:

  • I like to plan for 1 full spare physical server per ~6, so that I can utilize Vmware’s Vmotion for migrating servers around
  • plan for buying/utilizing SAN storage of some form so your VMs can be moved to different physical servers easily

I originally answered this topic ~2 years ago on serverfault.com.

engineering, ideas, technical

Post navigation

Previous Post: new connexions collection available
Next Post: debugging authorized_keys and ssh

More Related Articles

containerized datacenters ideas
more thoughts on `|stats` vs `|dedup` in splunk insights
folding@home – ewok cabaret personal
moab con 2011 news
a break from digitalia personal
next update: keeping your let’s encrypt certs up-to-date technical
August 2011
S M T W T F S
 123456
78910111213
14151617181920
21222324252627
28293031  
« Jul   Sep »
RSS Error: WP HTTP Error: cURL error 60: SSL: no alternative certificate subject name matches target hostname 'paragraph.cf'

Books

  • Debugging and Supporting Software Systems
  • Storage Series

External

  • Backblaze
  • Cirkul
  • Fundrise
  • Great Big Purple Sign
  • Password Generator
  • PayPal
  • Tech News Channel on Telegram
  • Vultr
  • Wish List

Other Blogs

  • Abiding in Hesed
  • Chris Agocs
  • Eric Hydrick
  • Jay Loden
  • Paragraph
  • skh:tec
  • Tech News Channel on Telegram
  • Veritas Equitas

Profiles

  • LinkedIn
  • Server Fault
  • Stack Overflow
  • Super User
  • Telegram
  • Twitter

Resume

  • LinkedIn
  • Resume (PDF)

Services

  • Datente
  • IP check
  • Password Generator
  • Tech News Channel on Telegram

Support

  • Backblaze
  • Built Bar
  • Cirkul
  • Donations
  • Fundrise
  • PayPal
  • Robinhood
  • Vultr
  • Wish List

35-questions 48laws adoption automation blog blogging books business career centos cloud community documentation email encryption facebook google history how-to hpsa ifttt linux money networking politics prediction proxy review scifi security social social-media splunk ssl startup storage sun-tzu tutorial twitter virtualization vmware wordpress work writing zombie

Copyright © 2025 antipaucity.

Powered by PressBook Green WordPress theme